Orleans Conservation Commission (revised)
Hearing Meeting Nauset Room October 7, 2014
8:30 a.m. Call to Order
Continuations
Last Heard 9/9/14 (BR1)
Thomas & Teresa Healy 36 Arey’s Lane
by East Cape Engineering, Inc. Assessor’s Map 62, Parcel 48. The proposed removal of an existing garage & driveway, construction of a new garage, driveway, deck, pool, pool house, & perform vegetation improvements. Work will occur within 100’ of the Edge of Wetland & Coastal Bank, & on a Coastal Bank, in Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.
Last Heard 9/16/14 (JO1)
Richard & Geraldine Nolin 125 Rock Harbor Road
by East Cape Engineering, Inc. Assessor’s Map 16, Parcel 70. The proposed upgrading of an existing leaching system. Work will occur within 100’ of the Top of a Coastal Bank, Salt Marsh, & within 200’ of the Edge of a River (Rock Harbor Creek).
Notice of Intent
Karen Lemoine 142 Portanimicut Road
by Ryder & Wilcox, Inc. Assessor’s Map 76, Parcel 16. The proposed installation of a tight tank & the filling of a cesspool. Work will occur within 50’ of the Top of a Coastal Bank, on a Coastal Bank, in Land Subject to Coastal Storm Flowage, & within the Pleasant Bay A.C.E.C.
Certificate of Compliance
Norma Quine (2000) 38 Herring Brook Way
The request for a Certificate of Compliance for an Order of Conditions for the removal of an existing cottage and shed, construction of a new cottage and shed, grading, and the installation of a sewage disposal system and underground utilities.
Norma Quine (2008) 38 Herring Brook Way
The request for a Certificate of Compliance for an Order of Conditions for the construction of additions to an existing dwelling and the relocation of an existing septic tank.
Enforcement Order
DEP # SE54-2201 14 Pond View Road
Discuss Violation of Order of Conditions and Vote to issue an Enforcement Order.
Administrative Reviews
Rebecca & Douglas Fellows 62 Captain Linnell Road
The proposed removal of 8-10 dead trees threatening house. Work to be done by Azinger Landscape.
Barbara & Steve Tyng 17 Packet Landing
The proposed removal of 1 pine next to house & 3 dead oak trees. Work to be done by A to Z Treez.
Warren Awtrey 157 Main Street
The proposed removal of 4 standing dead trees. Work to be done by Colson’s Landscaping.
Lawrence Gaine 6 Marshwind Lane
The proposed construction of a cobble stone apron and re-stoning the existing driveway with new crushed stone. Work to be done by Sun & Surf Inc.
Todd Thayer 82 Arey’s Lane
The proposed removal of 4 locusts, 1 pitch pine, and 1 dead cedar tree. Work to be done by applicant and Bartlett Tree.
Peter Worley 26 Deer Run
The proposed removal of 2 large pines with stumps flush cut. Work to be done by Wilkinson Ecological Design.
Allison Ferring & Thomas Ferraro 199 Namequoit Road
The proposed installation of two support posts on a Coastal Stairway at the Top of the Slope. Work to be done by Anchor Marine.
Penny Levin 48 Locust Road
The proposed removal of 3 Black Oaks. Work to be done by ABC Tree.
Chairman’s Business
Approval of the Minutes from the Meeting on September 9 & 23, 2014
Other Member’s Business
Sea Call Farm
-Supporters Agreement: Discussion Draft
-Caretakers Agreement: Vote to sign Renewal
Administrator’s Business
|